[Nov 19, 2021] Powerful C_TS422_1909 PDF Dumps for C_TS422_1909 Questions [Q37-Q57]

Share

[Nov 19, 2021] Powerful C_TS422_1909 PDF Dumps for C_TS422_1909 Questions

Authentic C_TS422_1909 Dumps - Free PDF Questions to Pass

NEW QUESTION 37
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the special procurement key of the phantom assembly in the BOM.
  • B. Change the item category of the phantom assembly in the BOM.
  • C. Change the explosion type of the phantom assembly in the BOM.
  • D. Change the phantom item indicator for the phantom assembly in the BOM.

Answer: C

 

NEW QUESTION 38
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • B. A group of alternative work centers providing a cumulative available capacity for production
  • C. A group of work centers in a production line being used in sequence for production
  • D. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel

Answer: B

 

NEW QUESTION 39
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:

  • A. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
  • B. Manually firm all planned orders for materials within the replenishment lead time of the material
  • C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
  • D. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material

Answer: A,C

 

NEW QUESTION 40
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Individual/Collective Indicator
  • B. Mixed MRP indicator
  • C. Dependent Requirements indicator
  • D. Storage Location MRP Indicator

Answer: B

 

NEW QUESTION 41
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:

  • A. Processing time
  • B. Floating time
  • C. Queue time
  • D. Tear down time
  • E. Move time

Answer: B,C,E

 

NEW QUESTION 42
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the reorder stock level
  • C. Fill up to the maximum stock level
  • D. Fill up to the safety stock level

Answer: A

 

NEW QUESTION 43
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?

  • A. MRP Profile
  • B. MRP Group
  • C. MRP Controller
  • D. Plant Data

Answer: B

 

NEW QUESTION 44
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Bulk materials
  • B. By-products
  • C. Waste products
  • D. Continuous flow materials
  • E. Co-products

Answer: B,C,E

 

NEW QUESTION 45
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Backflushing
  • B. Transfer Order
  • C. Kanban
  • D. Picking list

Answer: D

 

NEW QUESTION 46
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:

  • A. Vendor consignment
  • B. In-house production
  • C. Subcontracting
  • D. Stock transfer

Answer: B,D

 

NEW QUESTION 47
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Orders (dispatched) chart
  • B. Capacity requirements chart
  • C. Work center capacities chart
  • D. Order (pool) chart

Answer: B,C

 

NEW QUESTION 48
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red Base
  • B. Top of Yellow
  • C. Top of Green
  • D. Top of Red

Answer: C

 

NEW QUESTION 49
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.

Answer: A

 

NEW QUESTION 50
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:

  • A. Elimination of document index tables
  • B. Elimination of output condition tables
  • C. Elimination of customer master tables
  • D. Elimination of LIS tables for rebates
  • E. Elimination of status tables

Answer: A,C,E

 

NEW QUESTION 51
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a reservation.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a production order.

Answer: A

 

NEW QUESTION 52
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:

  • A. By eliminating inventory tables
  • B. By eliminating fields for different stock types
  • C. By eliminating material master tables
  • D. By eliminating hybrid tables
  • E. By eliminating inventory history tables

Answer: A,B,E

 

NEW QUESTION 53
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Flow manufacturing
  • B. Monitor Production Orders Fiori app
  • C. Lock-free inventory movements
  • D. Material Coverage Fiori app
  • E. Rough-cut capacity planning

Answer: B,C,D

 

NEW QUESTION 54
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand.
Which is the appropriate planning strategy to use?
Response:

  • A. 20 - Make to order production
  • B. 10 - Anonymous make-to-stock
  • C. 50 - Planning without final assembly
  • D. 40 - Planning with-final-assembly

Answer: D

 

NEW QUESTION 55
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:

  • A. With respect to a common change status for product and each assembly
  • B. With respect to defined separate key dates for product and each assembly
  • C. With respect to a common key date for product and each assembly
  • D. With respect to a defined separate change status for product and each assembly

Answer: B

 

NEW QUESTION 56
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:

  • A. A user trigger material availability check via mass processing (transaction COHV)
  • B. A user trigger printing of shop floor paper manually (transaction CO02).
  • C. A user can trigger material staging via mass processing (transaction COHV).
  • D. A user can schedule a background job to release production orders (transaction COOIS).

Answer: B

 

NEW QUESTION 57
......


SAP C_TS422_1909 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components
Topic 2
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
Topic 3
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S/4HANA
Topic 4
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
Topic 5
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S/4HANA
Topic 6
  • Outline best practices for using SAP S/4HANA
  • Production Orders in SAP S/4HANA
Topic 7
  • Explain and compare the different production methods in make-to-order
  • Outline the basics and master data of advanced planning
Topic 8
  • Introduction to SAP S/4HANA Production Planning
  • Outline production planning components and functions
Topic 9
  • Outline both motivation and background of SAP S/4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses
Topic 10
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation

 

Guaranteed Accomplishment with Newest Nov-2021 FREE : https://www.itexamdownload.com/C_TS422_1909-valid-questions.html

Use Valid New Free C_TS422_1909 Exam Dumps & Answers: https://drive.google.com/open?id=1wPurt_w9uJhMmENGUUdnRLJ2DawrzzvG